P2R - Petroleum Residues Recycling

ADVANTAGES :

Factory-Built :

  • No delays or risks due to climate.
  • Labour savings on the construction site.
  • Shorter schedule by shift work.
  • Factory-equipped for packing and shipping.

Qualtity and standardisation :

  • Construction.
  • Process.
  • Products.

Start up :

  • Production and analyses tests in real conditions.
  • Factory tested and verified.
  • On-site start up schedule time reduced.

Reduced cost :

  • Quick erection means field labour costs reduced.
  • Travel and start up expenses incurred by specialists due to pre-factory tests and modular design.
  • Engineering expenses amortizable on several projects

Income products :
Slops and sludges (water / oil mix) deemed as hazardous products and most of the time incinerated (valorization zero )

Outcome products :
Light distillat similar to naphta and suitable for power production and heavy fuel suitable for manufactures  (valorization : domestic petroleum products price less a incitement discount).

Investment :

  • RPR unit cost : 800,000 €  FOB (Europe Harbour)
  • Local works (Storages, Buildings, Facilities, Electricity, Roads, Site works etc …) between 800,000 € up to 1,200,000 €  (depend of country local conditions and site.
  • Engineering, Commissioning, Start-up and Training : 200,000 € + local expenses.

Operating costs :  6 €  up to 10 € per ton according to local conditions , included processing and labor costs expenses.

Pay out time : Between 2 and 3 years, depending of local taxes and domestic slops collect rate

P2R mp : A profitable solution to protect the sea